Frog Lake First Nation Jr./Sr. High School

Frog Lake, AB

The new school will provide relief from overcrowding at the existing location & accommodate a growing student population into future school years. The new school is an addition to the existing Frog Lake Community Recreation Center.

The new school for the Frog Lake First Nation features mass timber glulam beams, columns and curves throughout the structure. A Glulam and CLT canopy will highlight the entrance to the school once complete. Western Archrib's structural wood products are featured prominently in the design, which include Spruce Pine Glulam columns and beams, along with Douglas Fir Glulam curves. Western Archrib also provided the specialty engineering for all the Glulam connections.

Architect: Manasc Isaac

Engineer: RJC Engineers

Contractor: Krawford Construction